{"id":3696,"date":"2017-08-10T21:40:55","date_gmt":"2017-08-10T21:40:55","guid":{"rendered":"https:\/\/nadc1.com\/?post_type=portfolio&#038;p=3696"},"modified":"2018-04-12T16:42:49","modified_gmt":"2018-04-12T16:42:49","slug":"compuware-headquarters-site-clearing","status":"publish","type":"portfolio","link":"https:\/\/nadc1.com\/?portfolio=compuware-headquarters-site-clearing","title":{"rendered":"Compuware Headquarters Site Clearing"},"content":{"rendered":"<blockquote>\n<h3>Urban Center Site Clearing &amp; Earthwork<\/h3>\n<\/blockquote>\n<p><strong>Work Performed:<\/strong> demolition, site clearing, earthwork, excavation, brownfield<\/p>\n<h4 class=\"alternative-heading\">Project Description<\/h4>\n<p>The Compuware project consisted of the removal of approximately 400,000 cubic yards of earthwork soils and site clearing which included the demolition, excavation and removal of approximately 16,000 cubic yards of existing reinforced concrete, including foundation walls, footings, grade beam, columns, slabs and other buried debris.<\/p>\n<h4 class=\"alternative-heading\">Project Details<\/h4>\n<p>Site excavation was to the face of soldier piles in an earth retention system. Site demolition also included the removal of an abandoned Detroit Edison steam tunnel that included asbestos abatement procedures. In addition to the excavation of existing materials NADC was responsible for continual site dewatering and soil erosion control, dust control and the installation of new fire hydrants on the site.<\/p>\n<p>Another hurdle to over come was the proximity of the Detroit People Mover and Sub-station to the excavation site. This required the submittal of a detailed construction and protection plan of existing structures prior to commencing of construction and excavation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Urban Center Site Clearing &amp; Earthwork Work Performed: demolition, site clearing, earthwork, excavation, brownfield Project Description The Compuware project consisted of the removal of approximately 400,000 cubic yards of earthwork soils and site clearing which included the demolition, excavation and removal of approximately 16,000 cubic yards of existing reinforced concrete, including foundation walls, footings, grade &hellip;<\/p>\n","protected":false},"author":2,"featured_media":3697,"template":"","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"portfolio_category":[31],"portfolio_tag":[],"class_list":["post-3696","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-demolition"],"acf":[],"_links":{"self":[{"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/portfolio\/3696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"version-history":[{"count":6,"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/portfolio\/3696\/revisions"}],"predecessor-version":[{"id":4715,"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/portfolio\/3696\/revisions\/4715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nadc1.com\/index.php?rest_route=\/wp\/v2\/media\/3697"}],"wp:attachment":[{"href":"https:\/\/nadc1.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3696"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/nadc1.com\/index.php?rest_route=%2Fwp%2Fv2%2Fportfolio_category&post=3696"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/nadc1.com\/index.php?rest_route=%2Fwp%2Fv2%2Fportfolio_tag&post=3696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}