NDA - Demolition Magazine - May/June 2015
Power DownFor the P.H. Glatfelter Paper Co. project, NADC used a Volvo EC700CHR ultra high reach demolition excavator with LaBounty MSD 1500 hydraulic rotating shear to deftly dismantle two chemical boiler buildings and electrostatic precipitator as well as related ductwork and piping. |
Detroit Free Press
Tops of Irish Hills Towers dismantled for repair workCrews began work this week dismantling portions of the Irish Hills Towers, two iconic wooden observation towers that stood for decades as signposts of a thriving tourist spot before falling into disrepair. >> Read Irish Hills Story |
Tear it down Strip the metal out. Pulverize the concrete. Shred it. Shear it. Dice it up and get it out of here. Bring it all down and start over. The idea of a total demolition job may sound haphazard and uncontrolled – but large-scale dismantling firms like North American Dismantling Corp. have moved far beyond the days of just swinging away with a wrecking ball. |
Demolition Magazine
NADC Clears GM Foundry in SaginawRecently, NADC, as the prime contractor, has completed the demolition of an old GM Malleable Iron Foundry, once a thriving industrial facility, located in Saginaw, Michigan. >> Read more |
Michigan Contractor & Builder
Demolition: Old GM FoundryA current demolition challenge for the company is a massive one-million square-foot former GM Saginaw Malleable Iron foundry facility located in Saginaw, MI. >> Read Story |