Work Performed: demolition, remediation, asbestos abatement, brownfield
Project Description
The project in Berlin, New Hampshire consists of the dismantling of an existing paper pulp mill composed of 85 separate structures totaling 600,000 square feet located over 120 acres.
The buildings included boiler houses, turbine buildings, bleach plants, offices, repair shops, co-gen plants, pump houses, dryer buildings, etc. The buildings comprise a multitude of construction including steel framing, concrete framing, wood framing, steel siding and brick,
Included in the project is the remediation of various universal wastes including CFC, mercury, solvents, black, white and green liquor.
Additionally North American Dismantling is to remediate 36 transformers (17 Non PCB and 19 PCB contaminated) and complete over $1,000,000.00 in asbestos abatement.
North American Dismantling was instrumental in the marketing and sales of over $10,000,000.00 in reusable equipment.
Contact us for more detailed information
on your power plant demolition project.
Remediation & Asbestos Abatement
Work Performed: demolition, remediation, asbestos abatement, brownfield
Project Description
The project in Berlin, New Hampshire consists of the dismantling of an existing paper pulp mill composed of 85 separate structures totaling 600,000 square feet located over 120 acres.
The buildings included boiler houses, turbine buildings, bleach plants, offices, repair shops, co-gen plants, pump houses, dryer buildings, etc. The buildings comprise a multitude of construction including steel framing, concrete framing, wood framing, steel siding and brick,
Included in the project is the remediation of various universal wastes including CFC, mercury, solvents, black, white and green liquor.
Additionally North American Dismantling is to remediate 36 transformers (17 Non PCB and 19 PCB contaminated) and complete over $1,000,000.00 in asbestos abatement.
North American Dismantling was instrumental in the marketing and sales of over $10,000,000.00 in reusable equipment.