P.H. Glatfelter Recovery Boiler Buildings Demolition
Spring Grove, Pennsylvania
NADC completed the dismantling and demolition of two recovery boiler buildings and associated process systems within an operating paper mill. The work included boilers, process equipment, piping, ductwork, tanks, a precipitator, a chipper structure and concrete foundations located within extremely limited clearances beside active plant operations.