A Planned Approach to Total Demolition
Every total demolition project requires a plan tailored to the structure, site conditions, surrounding operations and final project objectives. NADC evaluates the complete scope before demolition begins so that each phase can be completed safely, efficiently and in the proper sequence.
Project Planning & Engineering
Structures, access requirements, equipment needs and demolition sequencing are evaluated to develop an approach specific to the property.
Utility & Environmental Coordination
Utility isolation, hazardous-material requirements and environmental controls are coordinated before and throughout demolition activities.
Controlled Demolition & Material Handling
Structures and equipment are removed in planned stages while debris, recyclable materials and recoverable assets are safely processed and separated.
Foundation Removal & Site Preparation
Concrete, foundations and remaining infrastructure are removed as required to prepare the property for redevelopment, construction or its next intended use.