A Planned Approach to Tank Removal & Decommissioning
Industrial tank removal requires more than simply dismantling the structure. NADC evaluates the tank, previous contents, surrounding infrastructure and final site requirements to develop a coordinated removal sequence that addresses environmental considerations, access and material handling from initial preparation through final disposal or recycling.
Tank & Site Evaluation
Tank type, dimensions, construction, access conditions, connected systems and surrounding infrastructure are reviewed to determine the appropriate removal approach.
Contents Verification & Preparation
Remaining liquids, residues and tank contents are identified so required pumping, cleaning, rinsing, testing or purging can be coordinated before structural removal begins.
Tank Dismantling & Removal
Above-ground tanks may be dismantled mechanically or in planned sections, while underground tanks are excavated and removed based on site conditions and access requirements.
Material Disposition & Site Restoration
Tank materials are prepared for recycling or approved disposal, while remaining foundations, piping or affected areas are addressed according to the project’s required final condition.